![](images/arrow-back.png)
118 Elgin Avenue
The entire building was purchased in 2011 and was demolished internally to be converted into 5 flats. All 5 flats were sold by early 2013 and the construction of the 6th flat on the top floor was completed in 2014.
The entire building was purchased in 2011 and was demolished internally to be converted into 5 flats. All 5 flats were sold by early 2013 and the construction of the 6th flat on the top floor was completed in 2014.